Denver International Airport (DEN) is building a new economy parking lot to help meet growing passenger demand at one of the busiest airports in the world.  Located south of the Worldport complex, the new lot will provide 5,200 parking spaces, replacing parking spaces displaced by construction of a new consolidated rental car facility and resulting in a net gain of approximately 2,000 spaces.

The South Worldport Lot project features a bus lane, concrete entrance, and exit lanes connecting to N. Elk Street and Jackson Gap Road, as well as a new traffic signal at N. Elk Street and E 75th Avenue, entrance and exit gate infrastructure, bus shelters, overhead lighting, and electric vehicle charging infrastructure. Utility improvements consist of new drainage infrastructure, underground electrical systems to support both planned and future needs, and waterline installation for fire suppression, including new fire hydrants.

As the fourth busiest airport in the United States and the tenth busiest in the world based on recent passenger statistics, DEN is expanding its facilities to meet increasing demand. With this expansion, the airport is committed to strategically considering the long-term economic, social and environmental impacts of its activities. DEN takes this approach to maximize lasting benefits and ensure that its projects support the airport and its community stakeholders. DEN has actively applied Envision on airside projects; the South Worldport Lot is its first landside project to use Envision.

Quotes

“The South Worldport Lot Project exemplifies how infrastructure can address immediate operational needs while considering long-term resilience, environmental performance and community priorities. The project team took a comprehensive approach to sustainability, integrating these considerations into planning, design and construction.” – Anthony Kane, ISI President and CEO

“The South Worldport Lot reinforced DEN’s Vision 100 strategic plan and DEN’s commitment to build sustainable and resilient infrastructure and its pursuit to become the greenest airport in the world. Envision provided a structured approach for integrating sustainability, resilience, and operational performance into the project’s design. The result is infrastructure that not only serves airport users today but is better prepared to adapt to tomorrow’s challenges.” – Alec Weiczorek, Project Manager from DEN

“The South Worldport Lot is another example of DEN’s commitment to integrating sustainability into our infrastructure projects and applying the Envision framework to ensure we consider long-term economic, environmental, and social benefits throughout planning, design, and construction.” – David Plakorus, Environmental Planning Manager from DEN

“One of the greatest benefits of using Envision was the way it fostered collaboration across the project team. It helped align designers, engineers, contractors, and stakeholders around a shared vision of creating infrastructure that provides long-term operational, environmental, and community benefits.” – Cassidy Nosenzo, Lead ENV SP from RS&H

“I’ve worked with Millstone Weber and DEN long enough to trust that their decision-making already considers key sustainability concepts. However; utilizing the Envision framework motivated us to actually quantify the impacts of this project, providing valuable data for the project team, the project owner, and our broader engineering and construction community. Now that we better understand what is economically feasible, I look forward to making room for more innovation!” – Kara Wright with Pinyon

“Millstone Weber is excited to support DEN in their continued expansion while maintaining DEN’s Guiding Principal of Sustainability & Resiliency.  We have expanded our vision to not only comply with project requirements but start to push sustainable practices out to the wider supplier /subcontractor network working with DEN and have seen large success with the results.”
– Curtis Daniels with Millstone Weber

Adaptable, Long-Term Sustainability Mindset

The South Worldport Lot has been developed under DEN’s sustainability policy. Its sustainability goals were developed during interdisciplinary kickoff meetings involving project staff at multiple levels from the design team (RS&H), owner (DEN), and contractor (Milestone Weber). Collaborative meetings have been used to identify opportunities, address challenges, and verify expectations, leading to improvement in sustainability performance over the course of the project. For example, meetings intentionally included contractor representatives and DEN operations and maintenance (O&M) personnel. Feedback from these team members helped inform decisions related to construction and operations, contributing to significant use of recycled materials, reduced water consumption, and lower construction and maintenance costs.

Here are some other examples of Envision-verified sustainability achievements on this project.

Verified Sustainability Achievements

Encourage Sustainable Transportation – The project is designed to provide convenient access to and encourage the use of public transit, including economy shuttles to transport patrons to and from the terminal. Bus stops are located within 500 feet of all parking spaces to facilitate convenient access. The airport and project also encourage transit use through integrated transit connections, digital resources, and public promotion.

Provide for Stakeholder Involvement – Stakeholders were engaged throughout planning, design, and construction, with input directly influencing project decisions. Feedback from the Community Advisory Committee, DEN Planning, DEN Commercial Enterprises, and others helped determine the final location, avoiding multiple relocations of the airside employee lot while consolidating DEN’s existing economy parking lots. Stakeholder input also informed roadway design, including the addition of a lane for the new parking lot and widening at entrances and exits.

Pursue Byproduct Synergies – The project created a beneficial reuse pathway by sourcing surplus materials from external entities. The contractor repurposed donated concrete beams from two firms to support reinforced concrete pipe, keeping the material in use and diverting it from the waste stream.

Reduce Construction Water Consumption – Through an Envision charrette, the project team identified strategies to reduce water use during construction. The strategies include water-efficient practices and low-flow plumbing fixtures in field offices, monitoring potable water leaks, using harvested or on-site water for truck washing and dust suppression, using dry dust-control methods, and adopting less water-intensive concrete curing methods. The contractor is required to implement at least three of the measures during construction.

Evaluate Risk & Resilience – Risk & resilience strategies were integrated into the project design following a comprehensive risk assessment for the project. Example strategies included widening of roadway entrances (accident reduction); choice of concrete over asphalt for the surface material to increase albedo (combatting heat-island effects); O&M procedures for drainage (preventing sedimentation); dual-fed electrical infrastructure (power resilience); removal of expansive soils and addition of Class 6 aggregate (subgrade resilience); and providing for manual ticketing in the event of a power outage. The strategies all aligned with community-wide plans including the City and County of Denver Hazard Mitigation Plan and the Climate Protection Fund Five-year Plan.

Improve Infrastructure Integration – The project integrates with utilities and transportation infrastructure within and beyond its boundary, enhancing the efficiency, redundancy, and resilience of DEN’s parking system. In addition to widening access lanes to reduce congestion, signage and transit access will streamline movement within and around the lot, reducing recirculation and improving efficiency.  The project is also enhancing stormwater controls and dual-fed electrical infrastructure to improve resilience to extreme weather events.

PROJECT DETAILS AT-A-GLANCE

Title: Denver International Airport South Worldport Lot
Location: Denver, Colorado
Envision Rating: Silver
Envision Award Date:  August 6, 2026
Envision Version: v3
Project Owner: Denver International Airport (DEN)
Project Sector: Transportation
Project Type: Parking Lot
Lead Envision Firm: RS&H
Estimated Total Cost of Project: $43M
Project Delivery Method: Design-Bid-Build
Project Status: In Construction